Regulatory Inspections
Cracked, porous or stained floors are a common observation in GMP and customer audits.

Vizag's pharma clusters, chemical units and heavy-engineering plants need floors that meet GMP standards and resist aggressive chemicals. Chemcoats designs and installs flooring systems for both.
Pharma and API plants are inspected against strict cleanliness standards, while chemical and engineering units expose floors to solvents, acids and heavy impact.
Cracked, porous or stained floors are a common observation in GMP and customer audits.
Spills in API, chemical and effluent areas eat through standard coatings and into the slab.

Floor defects can delay batch release and approvals for new blocks.
Joints and cracks harbour residues that are hard to validate as clean.
Chemical attack on the concrete itself leads to expensive structural repairs.
Seamless, coved, non-shedding floors suited to classified areas.
Novolac epoxy, PU and acid-resistant linings selected for the chemicals on site.
Installs timed with your maintenance shutdowns and block handovers.
We cover Vizag's pharma, chemical and engineering clusters. Key industries: Pharmaceuticals & API, Chemicals, Steel & Heavy Engineering, Apparel & Textiles, Port Logistics, Food Processing .
We follow a rigorous 5-step application process to ensure a bond that lasts for years.
Slab inspection, moisture and hardness checks, traffic and chemical exposure mapping.
Diamond grinding or shot blasting to open the concrete and create a mechanical bond profile.
Cracks, joints and pits are filled, then a penetrating primer seals the slab.
Epoxy, PU or ESD build coats applied to the specified thickness, in phases around production.
Finish coat, cure, inspection and handover with test reports and maintenance guidance.
We install seamless, non-porous, coved systems that support GMP compliance. We'll match the system to your area classification and cleaning regime.
Novolac epoxy or specialised acid-resistant linings, depending on the chemical and concentration. Share your chemical list and we'll recommend the system.
Yes. We plan crew strength and curing times so the floor is ready when your shutdown ends.
Yes. We mobilise a full crew and materials for the duration of the project and include travel in the quote.
Get a zone-wise flooring specification and a schedule that fits your shutdown window.